Select Page

Namwater Dam Bulletin on Tuesday 02 May 2023

Namwater Dam Bulletin on Tuesday 02 May 2023

A blank space or an (NR) indicates no readings received.

An (e) indicates that the water level has been estimated.

An (w) indicates that the conditions were very windy, resulting in an inaccurate reading.

Omatjenne Dam does not have abstraction facilities.

The dam contents are according to the latest dam basin surveys.

The inflow that is reflected in the bulletin does not take into account evaporation and abstraction of water.

An (N/A) indicates that there is no rain gauge at the dam.

* Transfer from Swakoppoort to Von Bach Dam was interrupted on 27 April 2023 at 07:00 and resumed at 16:00.

** Transfer from Omatako to Von Bach Dam took place until 26 April 2023.

*** Transfer from Otjivero Main Dam to Tilda Viljoen Dam and Daan Viljoen Dam took place.


 

About The Author

Typesetter

Today the Typesetter is a position at a newspaper that is mostly outdated since lead typesetting disappeared about fifty years ago. It is however a convenient term to indicate a person that is responsible for the technical refinement of publishing including web publishing. The Typesetter does not contribute to editorial content but makes sure that all elements are where they belong. - Ed.